Planning, Scheduling and Time Management of Six Lanes Road Construction Work at V.O.C Port Trust using Primavera P6 Software
Author(s):
P. Esakki Thangam , EINSTEIN COLLEGE OF ENGINEERING,TIRUNELVELI; R. Magdalene Benila, EINSTEIN COLLEGE OF ENGINEERING,TIRUNELVELI
Keywords:
Critical Path, Planning, Primavera P6, Scheduling, Six Lanes Road Work, Time Management
Abstract:
Effective time planning is very important in determining a success of any project. Thus, without proper time controlling will cause project delay and consequently budgeted cost overrun. In this project, VOC port trust of Tuticorin is considered. It had only four lanes which were not sufficient to tolerate the traffic. For this purpose an alternate arrangement of a six lanes is constructed. The work carried out was not done by proper planning, scheduling and resource allocation. So, that the resources were wasted and the time was extended. For reducing this wastage in time. It can be done by using the primavera p6 software. In this project, the planning, scheduling, resource allocation, cost and time management were of done by using primavera P6 software. This software improves the quality of construction with stipulated cost and time. Finally implementation of sequence can be done by using minimum time, cost and resources.
Other Details:
| Manuscript Id | : | IJSTEV2I11318
|
| Published in | : | Volume : 2, Issue : 11
|
| Publication Date | : | 01/06/2016
|
| Page(s) | : | 785-792
|
Download Article